The Enercon E-126〔(Grenzenlose Windkraft? a 28:30 min German 3Sat movie on the E-126 Estinnes windfarm construction )〕 is a wind turbine model manufactured by the German company Enercon. With a hub height of , rotor diameter of and a total height of , this large model can generate up to of power per turbine, making it the wind turbine with the second highest nameplate capacity after the Vestas V164. The power output of the generator was changed from to after technical revisions were performed in 2009. Since 2011 the E-126 is available as a 7.6 MW nameplate windturbine. Actual output in service may slightly exceed the nominal rating. The E-126 incorporates power electronics and offers grid stabilising capabilities.〔(http://www.enercon.de/en-en/752.htm Grid integration & Wind farm management )〕 The weight of the foundation of the turbine tower is about 2,500 t, the tower itself 2,800 t, the machine housing 128 t, the generator 220 t, the rotor (including the blade) 364 t. The total weight is about 6,000 t.〔()〕 The first turbine of this model was installed in Emden, Germany in 2007.〔(Enercon E126 ) from official Enercon website〕 The list price of one unit is $14 million plus install costs.〔(Enercon E126 )〕 ==Enercon E-126 market== In June 2012, at least 147 Enercon E-126 windturbines were operating, in construction, or nearing final approval, 35 of them completed and operating.〔(Summary of existing and planned E-126 wind turbines ) (based on public available www-info till June 2012)〕 Furthermore, during 2010-2011, onshore wind farm projects still in their early design processes were considering wind turbines of the 2-3.5 MW class, or wind turbines of the 5-8 MW class. This approach is at least applied in the Netherlands. Examples for this trend are found for instance in the preliminary research for the "Wind farm de Drentse Monden"〔(Wind farm de Drentse Monden )〕 aiming at 300-450 MW with possibly 50-60 E-126/7.5 MW turbines, "Wind farm N33"〔(Wind farm N33 )〕 aiming at >120 MW with possibly 15-40 E-126/7.5 MW turbines, "Wind farm Krammer"〔(Wind farm Krammer )〕 aiming at >100 MW with possibly 11-21 E-126/7.5 MW turbines, "Wind farm Wieringermeer"〔(Wind farm Wieringermeer )〕 aiming 200-400 MW with possibly 60 or more 6+ MW turbines (in that case possibly Repower 6M/6.15MW). 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Enercon E-126」の詳細全文を読む スポンサード リンク
|